Boiler Inspection for Registration





Boiler Inspection for Registration


Ministry of Industry / March 14, 2022

Basic requirements to receive the service

    When applying to the relevant inspector for Boiler registration, the following certificates related to the boiler must be submitted along with the application:
1. Documents related to imported boiler or locally purchased boiler;
2. Certificate of production and test standards complied with in boiler production;
3. The boiler is inspected and inspected according to the official certificate issued by the relevant country.
4. Production process of steel used in boilers; Physical properties; Certificates of Chemical Properties and Industrial Properties;
5. Boiler detailed design; X-rays of welded joints and thermal graphs;
7. Boiler manufacturer company logo and serial number;
8. Intentional construction pressure; The amount of steam produced and the fuel to be used;
9. Detailed drawing of boiler connection with boiler;
10. Evidence and certificate prescribed by the Inspector General from time to time.


Service fee
    Minimum from 30,000 kyats to maximum 150,000 kyats depending on the boiler of Heating Surface area.
No    Heating Surface Area(Square meters)    Registration fee(Kyats)
(A)    to 5                                                                    30000    
(B)     from 5 to 10                                                      40000
(C)    from 10 to 30                                                     50000    
(D)    from 30 to 50                                                     60000
(E)     from 50 to 70                                                    70000
(F)     from 70 to 90                                                    80000
(G)     from 90 to 110                                                100000
(H)    from 110 to 200                                               120000
(I)    above 200                                                         150000

Levels of service
(1) The applicant shall submit the application with the required documents to the Industrial Sector or Industrial State or Relevant State and Region Industrial Supervision and Inspection Department of the Myanmar Investment Commission One Stop Service.
(2) The boiler inspector will inform the applicant in advance of the inspection date.
(3) During the inspection, the inspector shall determine the size of the boiler; Pressure resistance will be calculated and tested with water pressure.
(4) If the boiler inspection is successful, the applicant shall pay the prescribed inspection fee.
(5) After paying the inspection fee, the applicant can submit the deposit slip to the Department of Industrial Supervision and Inspection (Boiler Inspection) and obtain the boiler license.

Where service is available
    Boiler Inspection (Head Office) Office No. (14), Naypyitaw, Phone: 067-3409650/3409651
Relevant Region / State / Union Territory (Nay Pyi Taw) and District Directorate Industrial Supervision and Inspection.



HOT NEWS
January 4,